Logan Canyon Scenic Byway
At a glance
41 miles of road between 4,544 and 7,726 ft; the high point is near mile 34.
Color moves from the east end, around Sep 16, to the west end, around Oct 7.
About 23% of the road has no trees that turn color and carries no date.
Dated places within 3 miles of the road
- Logan Canyon (US-89)mile 4 · Sep 26
Peak color 2026 (Estimate)
Each area's predicted peak window. The date doesn't change this view.
The predicted color stage on the selected date, modelled from years of fall color records. A forecast, not a live observation.When each area's color is predicted to peak this season. The date doesn't change this view.
© OpenStreetMap contributors · Esri, Garmin, USGS, NPS, HERE · Data creditsPowered by Esri
Peak Timing Along the Route
Each date is the median peak of the trees that turn colour within 1,640 ft of the road, over about 2.5 miles of it. Hover for elevation and predicted peak date.
Sep 13 (earliest)Oct 8 (latest)
No trees that turn colour along this stretch
Elevation 4,544–7,726 ft over 41 miles · 43 of 56 sample points dated
Dense forests and meadows that color strongly in autumn.